Finish Along Q4 2020
1. (Q3 2015) I'm making a low-volume and turquoise version of a scrappy trip around the world quilt and I've made forty-four blocks so far. Here are twenty-four of them!
2. (Q2 2016) I have been planning this quilt since at least 2013 and would like to at least make a start on prepping blocks. (I've been saying that for a while...) I have a range of backgrounds and some gorgeous Oakshott (Scandinavian, I think). The block pattern is in the photo and I've already completed a test block.
3. (Q2 2016) This needs layering and pinning ready for quilting, once I've bought the wadding, pieced the backing and decided how I'm going to quilt it. I doubt I'll make progress on this for quite a while, but once a project is on my FAL list, it stays on until it's either finished or officially abandoned! (No, they're not two different colours of background, it's just the difference between pieced/unpieced and straight/bias - you don't see it in real life.)
4. (Q4 2016) I'm going to turn this pink pin cord into a round neck pinafore version of the Kate dress:
5. (Q4 2016) This rather 80s winter sports print (it really could be from then as it came out of someone's loft!) is going to become a version of the Kate dress or Dress No. 2, possibly with a v neck and long/elbow length sleeves.
6. (Q2 2017) The top fabric is going to become a Kate dress (or dress No. 2):
8. (Q2 2017) I want to make a Christmas quilt (yes, another one!) from these pieces of Winterkist. I'm going to make a version of Sarah's Stained quilt, with navy sashing (thanks for the idea, Salley!). I’ve cut out the gnomes I’ll use on the front and designed the blocks and worked out the cutting instructions.
9. (Q2 2017) This Italian lawn is going to become a top version of the Kate dress or a shirt no.1, depending on how I feel when I lay it on the sewing table:
10. (Q4 2017) The pinafore I made last year needs a lining (it needs a slip under it, but the armholes are too low for the slips I have, so a lining it is):
11. (Q4 2018) Jeans: I’ve tacked together the legs and a trial yoke and waistband and had a fitting. I’m now unpicking all that so I can start sewing them together properly once I’ve cut out all the pieces.
For the third quarter running, I haven't added a new item to the list!!! (Mind, I haven’t crossed anything off it, either!) I'm definitely still a member of the #RidiculouslyLongFALList gang because there's no way I'm finishing all these things in a mere three months!
Mini Archie is, as ever, keeping a close eye on me:
Mini Archie is, as ever, keeping a close eye on me:
What is you doing out here? You should be in there, sewing! *tuts* |
Comments
Post a Comment
I love comments, thank you for yours!!
P.S. I've had to activate comment moderation for older posts so if your comment doesn't appear, it's probably in my inbox awaiting my attention!
P.P.S. If you have a 'no reply' account (no blogger id/a wordpress blog/you aren't sure), please feel free to leave me a separate comment with just your email address in it (myemailaddress(at)wherever.co.uk to save any bots grabbing it), I shall add that to my address book so I can reply via email and then delete that comment. No worries if not, I shall reply within the comments!